![]() ![]() Denver Union Station is LEED certified.ĭenver Union Station has been awarded the Eagle Award of Excellence for Historical Renovation, Design Build and Free Enterprise Award from Associated Builders & Contractors, the Downtown Denver Partnership Award from the Downtown Denver Partnership, and the Global Award for Excellence from Urban Land Institute. ![]() M/E/P systems were upgraded to current building codes. Browse 1,829 authentic denver union station stock photos, high-res images, and pictures, or explore additional denver beer or denver city park stock images. New life-safety systems serve the hotel and the Great Hall atrium needs including updated fire sprinkler systems, fire alarm systems, and atrium emergency smoke evacuation system. Interior modifications to the building included structural additions of a floor level (mezzanine) between the existing ground and second floor to create a four story building, selective excavation of existing crawlspace area, addition of four elevators and four emergency egress stairs and the restoration of the grand staircase. flags flapping in the wind. February 1, 2008: Lit by neon lights at night in downtown Denver, the historic 1880s and 1940s Union Station train station stands lit with U.S. ![]() Interior demolition occurred to provide a 112-key independent hotel, with associated restaurant uses and supplemental retail on the ground floor while accommodating the existing tenant needs and space requirements of Amtrak on the ground floor and lower level.Įxterior modifications included the addition of new dormers with windows into existing attic space, lowering historic window sills and repairing window openings at the ground level and restoration and/or addition of entrances into the hotel, restaurants and retail spaces. Nighttime over Union Station of Denver Colorado 'Denver, Colorado, U.S.A. The Denver Union Station Redevelopment Project was one of the most comprehensive and ambitious transit-oriented developments built in the U.S. Primary areas of restoration and abatement included repair of the exterior stone and terra cotta, restoration and repair of the iron canopy and restoration of the existing Great Hall. At the start of design review the City of Denver desired a building that would blend into the downtown commercial business district. The design-build project involved extensive exterior restoration and modifications and interior renovations and additions to an existing three story historic train station. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |